First train for Nhon-Hanoi Station line arrives in Hanoi

by NDO20 October 2020 Last updated at 17:51 PM

The train cars being transported to the Nhon Depot
The train cars being transported to the Nhon Depot

VTV.vn - The first train for Hanoi’s Nhon-Hanoi Station metro line has arrived at the Nhon Depot two days after reaching the port of Hai Phong on October 18.

Four cars from the train were transported by sea from France to Hai Phong and then carried by road to Hanoi.

After arriving at the Nhon Depot on October 20, the train cars were then put onto the tracks, assembled and driven to the technical zone awaiting trial run.

The remaining nine trains of the Nhon-Hanoi Station Line are being manufactured in France and will be transported to Vietnam in 2021.

The line is expected to enter service on the 8.5-kilometre-long elevated section in the latter half of 2021 while 4 kilometres of underground tracks will be put into use by the end of 2022.

Top VND Exchange Rates

Auto-refesh 15m

USD

EUR

AUD
1 VND
Inverse:
0.00004
22,510.0
0.00004
25,226.0
0.00006
15,674.0

Mid-market rates: 2024-11-25 23:14 UTC