First metro train reaches HCMC

by VTV409 October 2020 Last updated at 00:00 AM

Photo: VNA
Photo: VNA

VTV.vn - At 8 am on October 8th, the metro train No. 1 Ben Thanh Suoi Tien arrived in Ho Chi Minh City.

Metro train No. 1 spans a total length of more than 61 m, with a maximum design speed of 110 km/h and 80 km/h (tunnel section).

The train can carry a total of 930 guests, with 147 sitting and 783 standing passengers. The length of Metro Line 1 will be expanded in the future.

To prepare to welcome the first train of metro line 1, the HCMC Urban Railway Management Board has coordinated with contractors to focus on different tasks, including the entry of foreign experts, importing trains, and site preparation.

The train is expected to be transported from Khánh Hội port to Long Binh Depot, District 9 on Oct 10th

Tags:

Top VND Exchange Rates

Auto-refesh 15m

USD

EUR

AUD
1 VND
Inverse:
0.00004
22,510.0
0.00004
25,226.0
0.00006
15,674.0

Mid-market rates: 2024-11-23 19:10 UTC