Ben Thanh-Suoi Tien metro line begins trial run on elevated section

by NDO27 April 2023 Last updated at 17:34 PM

The train begins trial run on the elevated section (Photo: NDO)
The train begins trial run on the elevated section (Photo: NDO)

VTV.vn - A train of the Ben Thanh – Suoi Tien metro line No.1 began its trial run on the 12km elevated section from Suoi Tien to An Phu station on April 26.

The Ho Chi Minh City’s Management Authority for Urban Railways and Japanese contractor Hitachi conducted the trial run.

According to the design of the elevated section, the train can run at a maximum speed of 110km per hour, but the contractor only operates at a speed of less than 50km, to ensure safety when testing.

The first trial run was conducted on a journey of nearly 9km in December 2022, while the second trial run was implemented on 11km, on April 15.

The purpose of the test run is not only to test the train but also to test the electromechanical equipment systems at stations, signal information systems and other functions and items, according to Nguyen Trung Hieu, Deputy Director of Project Management Unit No.1, under the Ho Chi Minh City’s Management Authority for Urban Railways.

The whole metro line No.1, with a total length of 20km, is scheduled to begin a test run on September 2, to prepare for the official run by the end of this year.

The Ben Thanh – Suoi Tien metro line No.1 has reached 95% of its progress, after more than 10 years of construction.

Tags:

Top VND Exchange Rates

Auto-refesh 15m

USD

EUR

AUD
1 VND
Inverse:
0.00004
22,510.0
0.00004
25,226.0
0.00006
15,674.0

Mid-market rates: 2024-04-29 14:14 UTC

WEATHER FORECAST