Ha Long-Van Don Expressway opens to traffic

by NDO01 February 2019 Last updated at 14:00 PM

A section of Ha Long-Van Don Expressway (Photo: Bao Giao thong)
A section of Ha Long-Van Don Expressway (Photo: Bao Giao thong)

VTV.vn - The Ha Long-Van Don Expressway, in the northern province of Quang Ninh, opened to traffic from February1, expected to shorten the travel time between Hanoi and Van Don Airport to two and a half hours.

The 60-kilometre expressway runs from one end of the Ha Long-Hai Phong expressway to the recently opened Van Don Airport.

It was built at a total cost of VND12 trillion (US$516 million), featuring 4 lanes, with a width of 25 metres, allowing speeds of up to 100 kilometres per hour.

There are four toll stations on the expressway with fees ranging from VND45,000 to VND435,000 (US$2 - US$19) depending on the type of vehicle.

The inauguration of the Ha Long-Van Don Expressway has completed a high-speed artery connecting Hanoi Noi Bai Airport with Hai Phong Cat Bi Airport and Quang Ninh Van Don Airport.

It is also expected to boost the socio-economic development of Quang Ninh province and the northern key economic region.

 

Tags:

Top VND Exchange Rates

Auto-refesh 15m

USD

EUR

AUD
1 VND
Inverse:
0.00004
22,510.0
0.00004
25,226.0
0.00006
15,674.0

Mid-market rates: 2024-11-23 19:12 UTC