Five lines are being tested during the first few days of the two-way trial. Each train runs ten minutes apart at a maximum speed of 65 kilometers per hour and stops at each station for 1 minute. They operate via automatic control system. The trial and its result are monitored and assessed by an independent consulting joint unit. The system will be tested three to six months before officially operating.