Vi

Cat Linh Ha dong railway test run

by VTV421 September 2018 Last updated at 14:49 PM

Comments0
Cat Linh  Ha dong railway test run
VTV.vn - A trial run of Cat Linh Ha Dong urban railway was conducted on (Sep 20th), with a length of 13 kilometers. Five trains are tested at the same time / during the first few days of the two-way trial.

Trains runs every ten minutes at a maximum speed of 65 kilometers per hour and stops at each station for 1 minute. They operate via automatic control system. The trial and its result are monitored and assessed by an independent consulting joint unit. The system will be tested three to six months before officially operating.